Menu

Bombax Gas Pipeline, Trinidad

Projects » Bombax Gas Pipeline, Trinidad

PROJECT DETAILS

Our Client had landed a 110 kilometer 4’ gas pipeline using dredge floatation basin and groin. They required detailed assessment of the long-term effects and post construction restoration requirements of works to minimize the possible impacts to the shoreline. CEAC conducted surveys; wave and hydrodynamic modelling that informed the client as to the best approach and minimum requirements to limit the impacts of erosion being experienced in Guayoguayare Bay, in south Trinidad.

Current predictions for falling tide Pipline route from offshore southeast trinidad Swell wave climate from the East-South-East

MARKETS

More Projects

Bahamas Water Supply Improvement Project – Climate Related Vulnerability and Risk Assessment

Turks and Caicos South Dock Redevelopment

Belle Air Flood Protection and Drainage Works

NMIA End of Runway Protection Works

Ian Flemming International Airport Runway Expansion

NMIA-GCF Concept Note