Menu

Dry River Bank Protection Works

Projects » Dry River Bank Protection Works

PROJECT DETAILS

The NWA in response to post hurricane damage embarked on the protection of the Dry River banks leading to the bridge. The works consisted of scour protection and channel desilting. CEAC was commissioned to provide contract certification and monitoring services for this 0.6 km of river protection works.

MARKETS

More Projects

Bahamas Water Supply Improvement Project – Climate Related Vulnerability and Risk Assessment

Turks and Caicos South Dock Redevelopment

Belle Air Flood Protection and Drainage Works

NMIA End of Runway Protection Works

Ian Flemming International Airport Runway Expansion

NMIA-GCF Concept Note