Menu

Petrojam EKT Wharf Dredging

Projects » Petrojam EKT Wharf Dredging

PROJECT DETAILS

Our Client, Boskalis, required support to monitor the dredging of the EKT offloading platform berth. For one month, CEAC provided •bathymetric surveys and daily dredge monitoring to ensure that depths were reach and to estimate daily dredge volumes. Dredging increased the water depth and facilitate the dock to accept 25,000-ton ships.

More Projects

Digital Terrain Model, Drainage Infrastructure Inventory and Conceptual Designs

Expansion and Roadway Improvement – Freeport Main Road, Montego Bay

Construction Supervision Services for ARFF building

Widening of Grange Lane, CAPEX Programme

SPARK Priority Roads Pipeline Rehabilitation Design

Design of Infrastructure Works for the Four BSIF IV Loan Sub-Projects