Our Client had landed a 110 kilometer 4’ gas pipeline using dredge floatation basin and groin. They required detailed assessment of the long-term effects and post construction restoration requirements of works to minimize the possible impacts to the shoreline. CEAC conducted surveys; wave and hydrodynamic modelling that informed the client as to the best approach and minimum requirements to limit the impacts of erosion being experienced in Guayoguayare Bay, in south Trinidad.