Menu

Jamalco Steam Line Instrumentation Platform

Projects » Jamalco Steam Line Instrumentation Platform

PROJECT DETAILS

The Jamalco Alumina Refinery at Halse Hall utilizes a temporary platform in facilitating the operations and maintenance team with access to a section of the new 12” (300mm) steam line instrumentation. As it stands, the temporary platform (scaffolding) presents safety and work efficiency concerns for the instrumentation team and requires a permanent fixture In facilitating the requests of the client.

CEAC Solution was engaged to provide a proposal for the engineering designs of a fixed working platform for the Instrumentation Loop access. It is proposed that the proposed working platform be connected to and accessed via the existing C17 tank platform.

EXPERTISE INVOLVED

Civil Engineering, Steel Frame Construction

More Projects

Bahamas Water Supply Improvement Project – Climate Related Vulnerability and Risk Assessment

Turks and Caicos South Dock Redevelopment

Belle Air Flood Protection and Drainage Works

NMIA End of Runway Protection Works

Ian Flemming International Airport Runway Expansion

NMIA-GCF Concept Note