PROJECT DETAILS

A Power Plant’s location is within a known flood prone area of Old Harbour Bay along the Bowers Gully. The location also prone to storm surges within the Portland Bight area as the site is approximately 1.5m above mean sea level.

CEAC Solutions conducted hydrological, and hydraulic analysis (flood plain modelling exercises) to determine the flood levels for the 50 and 100year storm events; collected anecdotal information to calibrate hydraulic model, catchment delineation, soils, and land use information. Hydrological modeling was undertaken of the 50 and 100 year events. Recommendations were made for minimum floor levels and critical facilities.

More Projects

Bahamas Water Supply Improvement Project – Climate Related Vulnerability and Risk Assessment

Turks and Caicos South Dock Redevelopment

Belle Air Flood Protection and Drainage Works

NMIA End of Runway Protection Works

Ian Flemming International Airport Runway Expansion

NMIA-GCF Concept Note