CEAC Solutions was engaged to manage the construction of the civil works for the foundation of the building and site yard. The foundation was designed on floating piles due to high water table and poor soil conditions. CEAC Solutions was responsible for coordinating materials, setting all surveying controls, material quality and construction specifications.

Installation of ground beams on top of piles

 