Our Client, Boskalis, required support to monitor the dredging of the EKT offloading platform berth. For one month, CEAC provided •bathymetric surveys and daily dredge monitoring to ensure that depths were reach and to estimate daily dredge volumes. Dredging increased the water depth and facilitate the dock to accept 25,000-ton ships.